This service is available for Lahore city only. Avail Free Delivery for Orders above 100,000. Shop now Hyundai AC available on installments for up to 10 months plan with 0% Markup Shop now
  • Home
  • Shop
  • Nasgas Air Cooler - 9800 HYBRID
NasGas

Nasgas Air Cooler - 9800 HYBRID

Nasgas 65L Hybrid Air Cooler with AC/DC power, pure copper motor, 1500 CFM airflow & 3-side honeycomb cooling—cool big spaces, even in load-shedding!
Rs. 27000

Total Amount

Rs. 27000

Down Payment
Installment Plan
Your Advance Amount is

Rs. 0

Monthly Installment

Rs. 0

Number of Installments

0

Total Amount on Lease

Rs. 0

Category: Air Cooler

The Nasgas NAC-9800 Hybrid Room Air Cooler is built for high-performance cooling with energy efficiency in mind. Equipped with a dual power system (AC 220V & DC 12V), it offers flexibility and uninterrupted cooling even during power outages. Its pure copper motor with 1450 RPM delivers consistent airflow, while the 3-wing fan and 1500 CFM air output ensure rapid air circulation.

The 65-liter water tank, 600 L/h water pump, and 3-side prime honeycomb cooling pads work together for extended, powerful cooling. Featuring 4-way air deflection and 3 ice bottles, this cooler is perfect for larger rooms or areas needing quick and effective temperature drops—all at just 60–70 watts power consumption.

Brand
Nasgas
Model
NAC-9800 HYBRID
Type
Hybrid Room Air Cooler
Power Source
AC 220V & DC 12V
Power Consumption
60–70 Watts
Motor RPM at Load
1450 RPM
Cooling Media
3-Side Prime Honeycomb Pads
Water Tank Capacity
65 Liters
Air Flow Rate
1500 CFM
Ice Bottles
3 Included

Payment Options and Purchase Requirements

 

1. Cash Purchase (Cash on Delivery)

Customers opting for a cash purchase must pay the full amount upon delivery of the product.
 

2. Instalment Plan Purchase

To purchase a product on instalments, the following documentation and information are required:
• Two Guarantors:
• Copies of their Computerised National Identity Cards (CNIC)
• Signatures
• Verification of identity and ownership
• Customer CNIC Copy
• Post-Dated Cheques (PDCs): (May be requested based on the individual case assessment)
• Recent Utility Bill Copy: (May also be required depending on the customer’s profile)
 

Order and Verification Procedure

• After placing an order, our customer service team will contact you within 24 business hours to confirm your purchase details.
• Upon confirmation, a verification officer will visit your premises to collect the necessary documents and obtain the required signatures.
• Guarantors can be relatives, friends, neighbours, or any individuals who own a home or operate a business.
• The verification process is typically completed within 48 hours. Following successful verification, the product is delivered within 3 business days.
25,000+ people are like our product and say good story.

4.9

2,488 Reviews
Average customer ratings
80%
10%
05%
03%
02%
Herman miller
06 April 2023
08

Lorem ipsum dolor sit sed do eiusmod tempor incididunt labore enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat. Duis aute irure dolor in reprehenderit in voluptate velit esse cillum dolore eu fugiat nulla pariatur. Excepteur sint occaecat cupidatat non proident.

Wilbur haddock
26 April 2023
06

Lorem ipsum dolor sit sed do eiusmod tempor incididunt labore enim ad minim veniamnisi ut aliquip ex ea commodo consequat. Duis aute irure dolor in reprehenderit in voluptate velit esse cillum dolore eu fugiat nulla pariatur. Excepteur sint occaecat cupidatat non proident.

Colene landin
28 April 2023
00

Lorem ipsum dolor sit sed do eiusmod tempor incididunt labore enim adquis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat. Duis aute irure dolor in reprehenderit in voluptate velit esse cillum dolore eu fugiat nulla pariatur. Excepteur sint occaecat cupidatat non proident.

Add a review

Shariah Compliance Statement:

All our transactions are conducted in strict accordance with Shariah. We charge only the agreed-upon amount, without any Riba (interest), hidden costs, or unjust conditions.

Scroll